{"id":31079,"date":"2026-09-02T08:00:00","date_gmt":"2026-09-02T06:00:00","guid":{"rendered":"https:\/\/blog.ptvgroup.com\/?p=31079"},"modified":"2026-09-02T08:13:51","modified_gmt":"2026-09-02T06:13:51","slug":"transit-network-design-leipzig","status":"publish","type":"post","link":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/","title":{"rendered":"How Leipzig Is Evaluating More Transit Network Options for 2040"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\"><h2>Table of contents<\/h2><ul><li><a href=\"#h-beyond-the-first-network-option\" data-level=\"2\">Beyond the First Network Option<\/a><\/li><li><a href=\"#h-from-manual-planning-to-automation\" data-level=\"2\">From Manual Planning to Automation<\/a><\/li><li><a href=\"#h-testing-the-approach-in-leipzig\" data-level=\"2\">Testing the Approach in Leipzig<\/a><\/li><li><a href=\"#h-four-lessons-learned\" data-level=\"2\">Four Lessons Learned<\/a><ul><li><a href=\"#h-data-quality-comes-first\" data-level=\"3\">Data Quality Comes First<\/a><\/li><li><a href=\"#h-constraints-shape-outcomes\" data-level=\"3\">Constraints Shape Outcomes<\/a><\/li><li><a href=\"#h-more-transparent-decisions\" data-level=\"3\">More Transparent Decisions<\/a><\/li><li><a href=\"#h-automation-supports-planners\" data-level=\"3\">Automation Supports Planners<\/a><\/li><\/ul><\/li><li><a href=\"#h-looking-ahead\" data-level=\"2\">Looking Ahead<\/a><\/li><li><a href=\"#h-get-a-free-ptv-visum-demo\" data-level=\"2\">Get a free PTV Visum demo<\/a><\/li><\/ul><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">When cities grow, public transport networks must grow with them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Leipzig, Germany, the population is projected to increase by around 5% between 2025 and 2040. During the same period, public transport demand is expected to grow by approximately 17%. For planning teams, this creates a fundamental question: how can we continue developing attractive public transport networks while evaluating an increasing number of potential future scenarios?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For network planning teams, the challenge is no longer simply designing a network. It is assessing enough viable alternatives to make confident long-term decisions without proportionally increasing planning effort.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Traditionally, transit network design relies heavily on professional experience. Planners develop c0oncepts, test alternatives, review results, refine assumptions, and repeat the process. This approach remains valuable, but it can become increasingly resource intensive when planning for long-term growth and complex network changes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At <em>Leipziger Verkehrsbetriebe<\/em> <em>(LVB)<\/em>, Leipzig&#8217;s public transport operator, we wanted to explore whether automated transit network design could support planners in this process. Our goal was not to replace planning expertise. Instead, we wanted to understand whether automation could help us evaluate more options, more systematically, and in less time.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a9ac0aeb089c&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a9ac0aeb089c\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"991\" height=\"624\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip1-991x624.png\" alt=\"Transit network design in Leipzig must address demand growing faster than population\" class=\"wp-image-31090\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip1-991x624.png 991w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip1-572x360.png 572w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip1-768x483.png 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip1-300x189.png 300w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip1.png 1282w\" sizes=\"auto, (max-width: 991px) 100vw, 991px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Demand for public transport is forecast to outpace population growth<\/figcaption><\/figure>\n\n\n\n<h2 id=\"h-beyond-the-first-network-option\" class=\"wp-block-heading\"><strong>Beyond the First Network Option<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most planning teams can develop a good network concept. The bigger challenge is knowing whether enough alternatives have been explored to make a confident long-term decision.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In strategic transit network design projects, dozens of potential routes, service patterns, frequencies, and operational <a href=\"https:\/\/blog.ptvgroup.com\/en\/technologyplus\/public-transport-network-design-with-ptv-visum-line-construction-procedure\/\" target=\"_blank\" rel=\"noreferrer noopener\">constraints must be considered simultaneously<\/a>. As planners, we often face limitations in time, staff resources, and project schedules. This naturally restricts the number of <a href=\"https:\/\/blog.ptvgroup.com\/en\/technologyplus\/public-transport-network-redesign-solving-the-challenges\/\" target=\"_blank\" rel=\"noreferrer noopener\">alternatives that can be explored<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a result, important planning questions emerge:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Have we considered enough alternatives?<\/li>\n\n\n\n<li>Are we focusing investment on the right corridors?<\/li>\n\n\n\n<li>Could a different service structure attract more riders?<\/li>\n\n\n\n<li>Are our planning assumptions transparent and reproducible?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These questions motivated our exploration of automated network design within <a href=\"https:\/\/www.ptvgroup.com\/en\/products\/ptv-visum\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>PTV Visum<\/strong><\/a>, with the goal of evaluating more alternatives in less time and with greater transparency.<\/p>\n\n\n\n<h2 id=\"h-from-manual-planning-to-automation\" class=\"wp-block-heading\"><strong>From Manual Planning to Automation<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One aspect of traditional planning can be described as &#8220;trial and error.&#8221; Experienced planners create alternatives, evaluate outcomes, and gradually improve the network concept.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The automated approach follows a different logic.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Instead of manually building every alternative, planners define objectives, constraints, and the framework within which the network should be developed. This includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Transport demand.<\/li>\n\n\n\n<li>Available infrastructure.<\/li>\n\n\n\n<li>Service standards.<\/li>\n\n\n\n<li>Vehicle constraints.<\/li>\n\n\n\n<li>Budget limitations.<\/li>\n\n\n\n<li>Operational requirements such as turnaround times and termini.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Based on these inputs, potential network alternatives can be generated and evaluated automatically. In automated transit network design, the role of the planner shifts from manually creating every option to defining objectives, reviewing alternatives, and interpreting results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This distinction is important. Automation does not eliminate planning expertise. It allows planning teams to evaluate more alternatives while applying their expertise where it creates the most value.<\/p>\n\n\n\n<h2 id=\"h-testing-the-approach-in-leipzig\" class=\"wp-block-heading\"><strong>Testing the Approach in Leipzig<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Our initial work focused on applying automated transit network design to future tram network scenarios for 2040.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Using projected demand and predefined operational constraints, we tested the automated construction of alternative tram networks and evaluated them within our existing <a href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/digital-transport-model-tashkent-ptv-visum\/\" target=\"_blank\" rel=\"noreferrer noopener\">transport modeling framework<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rather than searching for a final 2040 network, we wanted to understand how automation could support planning teams in evaluating future alternatives more systematically.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Specifically, we wanted to understand:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>How realistic the generated networks would be.<\/li>\n\n\n\n<li>Which assumptions had the greatest influence on results.<\/li>\n\n\n\n<li>How automation could fit into existing planning workflows.<\/li>\n\n\n\n<li>Where additional development would be necessary.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This perspective is important because planning innovations are often judged too quickly based on a single result. In our case, the most valuable outcome was not a specific network proposal. It was a better understanding of how planning teams can use automation to evaluate alternatives and support long-term decision-making.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a9ac0aeb1d37&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a9ac0aeb1d37\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"877\" height=\"624\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip2-877x624.png\" alt=\"Example transit network design scenario generated for Leipzig's 2040 tram planning\" class=\"wp-image-31088\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip2-877x624.png 877w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip2-506x360.png 506w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip2-768x547.png 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip2-281x200.png 281w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip2.png 1131w\" sizes=\"auto, (max-width: 877px) 100vw, 877px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Generated tram network scenario used for 2040 planning tests<\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a9ac0aeb268b&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a9ac0aeb268b\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"875\" height=\"624\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip4-875x624.png\" alt=\"Evaluation of a transit network design scenario generated for Leipzig\" class=\"wp-image-31084\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip4-875x624.png 875w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip4-505x360.png 505w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip4-768x548.png 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip4-280x200.png 280w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip4.png 1124w\" sizes=\"auto, (max-width: 875px) 100vw, 875px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Generated network scenarios were assessed against planning goals<\/figcaption><\/figure>\n\n\n\n<h2 id=\"h-four-lessons-learned\" class=\"wp-block-heading\"><strong>Four Lessons Learned<\/strong><\/h2>\n\n\n\n<h3 id=\"h-data-quality-comes-first\" class=\"wp-block-heading\"><strong>Data Quality Comes First<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Data quality<\/strong> determines the value of any automated transit network design process. Demand forecasts, travel times, infrastructure coding, and operational inputs all influence the solution space. Poor inputs will inevitably lead to poor outputs. The planning process therefore starts with a robust modeling foundation.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a9ac0aeb2ff4&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a9ac0aeb2ff4\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1110\" height=\"378\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3-1110x378.png\" alt=\"Transport modeling provides the foundation for automated transit network design\" class=\"wp-image-31086\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3-1110x378.png 1110w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3-640x218.png 640w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3-768x262.png 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3-1536x524.png 1536w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3-300x102.png 300w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Leip3.png 1880w\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Reliable modeling is essential for meaningful planning results<\/figcaption><\/figure>\n\n\n\n<h3 id=\"h-constraints-shape-outcomes\" class=\"wp-block-heading\"><strong>Constraints Shape Outcomes<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Constraints<\/strong> are just as important as the optimization itself. Vehicle availability, service standards, turning facilities, and operational rules all influence the alternatives generated. In practice, defining these constraints correctly is often as important as selecting the right planning objectives.<\/p>\n\n\n\n<h3 id=\"h-more-transparent-decisions\" class=\"wp-block-heading\"><strong>More Transparent Decisions<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most promising observations was the increase in <strong>transparency<\/strong>. When planners explicitly define <a href=\"https:\/\/blog.ptvgroup.com\/en\/technologyplus\/efficient-public-transport-essential-steps\/\" target=\"_blank\" rel=\"noreferrer noopener\">objectives, assumptions, and constraints<\/a>, it becomes easier to explain why alternatives were generated and how they were evaluated. This can improve communication within planning teams and support discussions with stakeholders.<\/p>\n\n\n\n<h3 id=\"h-automation-supports-planners\" class=\"wp-block-heading\"><strong>Automation Supports Planners<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The most important lesson is that <strong>automation supports planners<\/strong>, it does not replace them. The technology can generate alternatives rapidly and reduce the amount of manual iteration required. However, professional judgment remains essential when evaluating feasibility, understanding local conditions, and selecting preferred concepts. The value lies in combining computational efficiency with planning expertise.<\/p>\n\n\n\n<h2 id=\"h-looking-ahead\" class=\"wp-block-heading\"><strong>Looking Ahead<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Our experience suggests that automated transit network design could become a valuable addition to the planning toolbox, particularly for organizations responsible for long-term network development. Its greatest potential may lie in helping planning teams evaluate more alternatives with a structured and transparent approach.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As demand grows and planning questions become more complex, the ability to systematically <a href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/ptv-visum-bus-network-redesign-timetable-based-evidence\/\" target=\"_blank\" rel=\"noreferrer noopener\">assess a larger number of network options<\/a> will become increasingly important. The greatest opportunity may not be finding a perfect solution. Instead, it may be giving planning teams a faster and more transparent way to explore possible solutions and identify promising directions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For Leipzig, this work is still evolving. Additional research and testing are needed, particularly regarding objective functions, planning constraints, and integrated optimization across multiple modes. Yet the direction is promising.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For planning managers facing growing demand, constrained resources, and ambitious long-term goals, that may be the most important lesson of all: the future of transit network design is not about replacing planners. It is about enabling them to evaluate more alternatives, make better-informed decisions, and plan with greater confidence.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column cta-box is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<div class=\"wp-block-cover\"><img loading=\"lazy\" decoding=\"async\" width=\"1254\" height=\"836\" class=\"wp-block-cover__image-background wp-image-25406\" alt=\"\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184.jpg 1254w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-540x360.jpg 540w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-936x624.jpg 936w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-768x512.jpg 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-300x200.jpg 300w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-80 has-background-dim wp-block-cover__gradient-background has-background-gradient\" style=\"background:linear-gradient(135deg,rgb(66,104,249) 28%,rgb(41,224,133) 88%)\"><\/span><div class=\"wp-block-cover__inner-container is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"has-text-align-center wp-block-paragraph\" style=\"font-size:24px;font-style:normal;font-weight:700\">Plan Future-Ready Public Transport Networks<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">Explore how PTV Visum helps planners test scenarios, evaluate network alternatives, and support long-term service development<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-f5f78b3b wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-white-background-color has-text-color has-background has-link-color has-text-align-center has-custom-font-size wp-element-button\" href=\"#h-get-a-free-ptv-visum-demo\" style=\"border-radius:8px;color:#6482f6;font-size:14px;font-style:normal;font-weight:500\" target=\"_blank\" rel=\"noreferrer noopener\">Get free demo<\/a><\/div>\n<\/div>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<h2 id=\"h-get-a-free-ptv-visum-demo\" class=\"wp-block-heading\">Get a free PTV Visum demo<\/h2>\n\n\n\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"card-text\">As demand grows faster than population, Leipzig is using automated network design in PTV Visum to test future transit concepts faster and more transparently. [&#8230;]<\/p>\n<p class=\"m-0\"><a class=\"btn btn-outline-secondary btn-read-more\" href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/\">Read More<\/a><\/p>\n","protected":false},"author":5,"featured_media":31239,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8326,8322],"tags":[8404,8380,8377,8371],"ppma_author":[8538],"class_list":["post-31079","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-modeling-planning","category-user-insights","tag-accessibility","tag-public-transport","tag-traffic-simulation","tag-urban-mobility"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Transit Network Design: Lessons from Leipzig&#039;s 2040 Planning | PTV Blog<\/title>\n<meta name=\"description\" content=\"Learn how Leipzig is using automated transit network design in PTV Visum to evaluate future network options faster and more transparently.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How Leipzig Is Evaluating More Transit Network Options for 2040\" \/>\n<meta property=\"og:description\" content=\"Learn how Leipzig is using automated transit network design in PTV Visum to evaluate future network options faster and more transparently.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/\" \/>\n<meta property=\"og:site_name\" content=\"PTV Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PTVGroupGlobal\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-02T06:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-02T06:13:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/09\/Untitled-design-47.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1025\" \/>\n\t<meta property=\"og:image:height\" content=\"577\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Guest Author: Matthias Schilde\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guest Author\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/\"},\"author\":{\"name\":\"Guest Author\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/person\\\/ed495d952d445e59d4114dedcd7a86ba\"},\"headline\":\"How Leipzig Is Evaluating More Transit Network Options for 2040\",\"datePublished\":\"2026-09-02T06:00:00+00:00\",\"dateModified\":\"2026-09-02T06:13:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/\"},\"wordCount\":1115,\"publisher\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Untitled-design-47.png\",\"keywords\":[\"Accessibility\",\"Public Transport\",\"Traffic Simulation\",\"Urban Mobility\"],\"articleSection\":[\"Modeling &amp; Planning\",\"User Insights\"],\"inLanguage\":\"en-US\",\"accessibilityFeature\":[\"tableOfContents\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/\",\"name\":\"Transit Network Design: Lessons from Leipzig's 2040 Planning | PTV Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Untitled-design-47.png\",\"datePublished\":\"2026-09-02T06:00:00+00:00\",\"dateModified\":\"2026-09-02T06:13:51+00:00\",\"description\":\"Learn how Leipzig is using automated transit network design in PTV Visum to evaluate future network options faster and more transparently.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Untitled-design-47.png\",\"contentUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Untitled-design-47.png\",\"width\":1025,\"height\":577},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/transit-network-design-leipzig\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Leipzig Is Evaluating More Transit Network Options for 2040\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/\",\"name\":\"PTV Blog\",\"description\":\"We passionately write about technology which helps to plan and optimise the movement of people and goods.\",\"publisher\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#organization\",\"name\":\"PTV Group\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/PTV_Group_Logo_black.jpg\",\"contentUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/PTV_Group_Logo_black.jpg\",\"width\":1598,\"height\":362,\"caption\":\"PTV Group\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PTVGroupGlobal\\\/\",\"https:\\\/\\\/www.instagram.com\\\/ptv_group\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ptv\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/ThePTVGroup\",\"https:\\\/\\\/www.tiktok.com\\\/@ptv_group\\\/\"],\"description\":\"Our goal is to drive the future of mobility toward a cleaner, smarter, and safer world. With a legacy spanning over 40 years as a leading global software company for traffic planning, simulation, and real-time management, we have garnered extensive experience in the field of mobility.\",\"email\":\"info@ptvgroup.com\",\"telephone\":\"+49 721 9651-0\",\"legalName\":\"PTV Planung Transport Verkehr GmbH\",\"foundingDate\":\"1979-01-01\",\"vatID\":\"Umsatzsteuer-Identifikationsnummer gem\u00e4\u00df \u00a7 27a Umsatzsteuergesetz (UStG): DE 812 666 053\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/person\\\/ed495d952d445e59d4114dedcd7a86ba\",\"name\":\"Guest Author\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g7b083b76ac19858e26f915f16946093d\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g\",\"caption\":\"Guest Author\"},\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/author\\\/_ptadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Transit Network Design: Lessons from Leipzig's 2040 Planning | PTV Blog","description":"Learn how Leipzig is using automated transit network design in PTV Visum to evaluate future network options faster and more transparently.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/","og_locale":"en_US","og_type":"article","og_title":"How Leipzig Is Evaluating More Transit Network Options for 2040","og_description":"Learn how Leipzig is using automated transit network design in PTV Visum to evaluate future network options faster and more transparently.","og_url":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/","og_site_name":"PTV Blog","article_publisher":"https:\/\/www.facebook.com\/PTVGroupGlobal\/","article_published_time":"2026-09-02T06:00:00+00:00","article_modified_time":"2026-09-02T06:13:51+00:00","og_image":[{"width":1025,"height":577,"url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/09\/Untitled-design-47.png","type":"image\/png"}],"author":"Guest Author: Matthias Schilde","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guest Author","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#article","isPartOf":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/"},"author":{"name":"Guest Author","@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/person\/ed495d952d445e59d4114dedcd7a86ba"},"headline":"How Leipzig Is Evaluating More Transit Network Options for 2040","datePublished":"2026-09-02T06:00:00+00:00","dateModified":"2026-09-02T06:13:51+00:00","mainEntityOfPage":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/"},"wordCount":1115,"publisher":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#organization"},"image":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#primaryimage"},"thumbnailUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/09\/Untitled-design-47.png","keywords":["Accessibility","Public Transport","Traffic Simulation","Urban Mobility"],"articleSection":["Modeling &amp; Planning","User Insights"],"inLanguage":"en-US","accessibilityFeature":["tableOfContents"]},{"@type":"WebPage","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/","url":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/","name":"Transit Network Design: Lessons from Leipzig's 2040 Planning | PTV Blog","isPartOf":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#primaryimage"},"image":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#primaryimage"},"thumbnailUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/09\/Untitled-design-47.png","datePublished":"2026-09-02T06:00:00+00:00","dateModified":"2026-09-02T06:13:51+00:00","description":"Learn how Leipzig is using automated transit network design in PTV Visum to evaluate future network options faster and more transparently.","breadcrumb":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#primaryimage","url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/09\/Untitled-design-47.png","contentUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/09\/Untitled-design-47.png","width":1025,"height":577},{"@type":"BreadcrumbList","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/transit-network-design-leipzig\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/blog.ptvgroup.com\/en\/"},{"@type":"ListItem","position":2,"name":"How Leipzig Is Evaluating More Transit Network Options for 2040"}]},{"@type":"WebSite","@id":"https:\/\/blog.ptvgroup.com\/en\/#website","url":"https:\/\/blog.ptvgroup.com\/en\/","name":"PTV Blog","description":"We passionately write about technology which helps to plan and optimise the movement of people and goods.","publisher":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blog.ptvgroup.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/blog.ptvgroup.com\/en\/#organization","name":"PTV Group","url":"https:\/\/blog.ptvgroup.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2021\/11\/PTV_Group_Logo_black.jpg","contentUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2021\/11\/PTV_Group_Logo_black.jpg","width":1598,"height":362,"caption":"PTV Group"},"image":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PTVGroupGlobal\/","https:\/\/www.instagram.com\/ptv_group\/","https:\/\/www.linkedin.com\/company\/ptv\/","https:\/\/www.youtube.com\/user\/ThePTVGroup","https:\/\/www.tiktok.com\/@ptv_group\/"],"description":"Our goal is to drive the future of mobility toward a cleaner, smarter, and safer world. With a legacy spanning over 40 years as a leading global software company for traffic planning, simulation, and real-time management, we have garnered extensive experience in the field of mobility.","email":"info@ptvgroup.com","telephone":"+49 721 9651-0","legalName":"PTV Planung Transport Verkehr GmbH","foundingDate":"1979-01-01","vatID":"Umsatzsteuer-Identifikationsnummer gem\u00e4\u00df \u00a7 27a Umsatzsteuergesetz (UStG): DE 812 666 053","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"}},{"@type":"Person","@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/person\/ed495d952d445e59d4114dedcd7a86ba","name":"Guest Author","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g7b083b76ac19858e26f915f16946093d","url":"https:\/\/secure.gravatar.com\/avatar\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g","caption":"Guest Author"},"url":"https:\/\/blog.ptvgroup.com\/en\/author\/_ptadmin\/"}]}},"authors":[{"term_id":8538,"user_id":0,"is_guest":1,"slug":"guest-author-matthias-schilde","display_name":"Guest Author: Matthias Schilde","avatar_url":{"url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Untitled-design-67.png","url2x":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/08\/Untitled-design-67.png"},"author_category":"1","first_name":"","last_name":"","user_url":"","job_title":"Matthias Schilde is a project lead for transport modeling and public transport planning at Leipziger Verkehrsbetriebe (LVB), the public transport operator in Leipzig, Germany.","description":"Matthias Schilde is a project lead for transport modeling and public transport planning at Leipziger Verkehrsbetriebe (LVB), the public transport operator in Leipzig, Germany."}],"_links":{"self":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts\/31079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/comments?post=31079"}],"version-history":[{"count":6,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts\/31079\/revisions"}],"predecessor-version":[{"id":31101,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts\/31079\/revisions\/31101"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/media\/31239"}],"wp:attachment":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/media?parent=31079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/categories?post=31079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/tags?post=31079"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/ppma_author?post=31079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}