{"id":30984,"date":"2026-08-19T08:00:00","date_gmt":"2026-08-19T06:00:00","guid":{"rendered":"https:\/\/blog.ptvgroup.com\/?p=30984"},"modified":"2026-07-29T10:55:34","modified_gmt":"2026-07-29T08:55:34","slug":"traffic-light-synchronization-milan-ptv-vissim","status":"publish","type":"post","link":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/","title":{"rendered":"How PTV Vissim tested tram traffic light synchronization"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\"><h2>Table of contents<\/h2><ul><li><a href=\"#h-the-challenge\" data-level=\"2\">The challenge<\/a><\/li><li><a href=\"#h-why-traffic-light-synchronization-mattered\" data-level=\"2\">Why traffic light synchronization mattered<\/a><\/li><li><a href=\"#h-building-the-ptv-vissim-model\" data-level=\"2\">Building the PTV Vissim model<\/a><\/li><li><a href=\"#h-testing-traffic-light-synchronization-pedestrianization-and-access\" data-level=\"2\">Testing traffic light synchronization, pedestrianization, and access<\/a><\/li><li><a href=\"#h-what-the-model-revealed\" data-level=\"2\">What the model revealed<\/a><\/li><li><a href=\"#h-lessons-for-planners\" data-level=\"2\">Lessons for planners<\/a><\/li><li><a href=\"#h-get-a-vissim-free-demo\" data-level=\"2\">Get a Vissim free demo<\/a><\/li><\/ul><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Fixed-time signal control combined with traffic light synchronization can help cities redesign complex street spaces with greater confidence, but only if it is tested in the wider context of pedestrian demand, access needs, and network operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Piazza Cordusio was one of Milan&#8217;s most complex mobility nodes. Cars, trams, bikes, and pedestrians shared the same space, creating conflicts and inefficient movement patterns. We used PTV Vissim to understand how these interactions affected mobility and public-space quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The square functioned more as an intersection than as a public space. Using PTV Vissim, we tested how pedestrianization, revised signal timing, and constrained vehicle access would affect tram operations, traffic circulation, and public-space quality before implementation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A key objective was to synchronize traffic lights and tram movements so that trams could cross the square without stopping in its center. By coordinating signal timings and removing stop lines within the square, we evaluated how pedestrian continuity, tram operations, and overall network performance could be improved together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article explains what we modelled, which outputs mattered most, and what lessons other planners can apply to similar <a href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/how-simulation-supports-historic-town-traffic-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">tram-heavy urban streets<\/a>.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bad12&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bad12\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"585\" height=\"241\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL9_compressed.jpg\" alt=\"Traffic light synchronization simulation in PTV Vissim for Piazza Cordusio\" class=\"wp-image-30977\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL9_compressed.jpg 585w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL9_compressed-300x124.jpg 300w\" sizes=\"auto, (max-width: 585px) 100vw, 585px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Traffic light synchronization tested in the Piazza Cordusio scenario <\/figcaption><\/figure>\n\n\n\n<h2 id=\"h-the-challenge\" class=\"wp-block-heading\"><strong>The challenge<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Piazza Cordusio sits at the heart of central Milan and functions as much more than a square. It is a multimodal hub that connects major pedestrian routes, tram corridors, and the M1 metro, while also accommodating tightly regulated vehicle access within a limited traffic zone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The study area included Piazza Cordusio, Via Dante, Via Orefici, Via Tommaso Grossi, and Largo Santa Margherita. This meant that movement, access, and public-space quality had to be treated as one system rather than as separate design questions.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bb619&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bb619\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"877\" height=\"624\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-Toponomastica-e-area-di-progetto-877x624.jpg\" alt=\"Project area around Piazza Cordusio and surrounding streets in Milan\" class=\"wp-image-30963\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-Toponomastica-e-area-di-progetto-877x624.jpg 877w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-Toponomastica-e-area-di-progetto-506x360.jpg 506w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-Toponomastica-e-area-di-progetto-768x546.jpg 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-Toponomastica-e-area-di-progetto-281x200.jpg 281w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-Toponomastica-e-area-di-progetto.jpg 1437w\" sizes=\"auto, (max-width: 877px) 100vw, 877px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Project area covering Piazza Cordusio and nearby streets<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The existing conditions showed why that mattered. The area carried intense tram activity, high pedestrian volumes at key crossings, and vehicle movements that still created delay and conflict despite access restrictions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Informal parking, suboptimal crossing conditions, and signal operations that interrupted tram movements or reduced pedestrian comfort all pointed to the same conclusion: geometry alone would not solve the problem. A key challenge was improving traffic light synchronization so that trams could move through the square more smoothly without disrupting pedestrian flow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To understand these interactions, we needed to test how the entire multimodal system behaved under peak demand rather than evaluate individual design elements in isolation.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bbdd0&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bbdd0\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"525\" height=\"152\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL3_compressed.jpg\" alt=\"Pedestrian and vehicle conflicts in Piazza Cordusio before redesign\" class=\"wp-image-30967\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL3_compressed.jpg 525w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL3_compressed-300x87.jpg 300w\" sizes=\"auto, (max-width: 525px) 100vw, 525px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Existing conflicts that motivated the redesign <\/figcaption><\/figure>\n\n\n\n<h2 id=\"h-why-traffic-light-synchronization-mattered\" class=\"wp-block-heading\"><strong>Why traffic light synchronization mattered<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In a project like this, street redesign and tram operations could not be tested separately. Closing a street, reallocating pedestrian space, or moving a stop line may look simple on a plan; the real issue is what happens to tram delay, queues, crossings, and access once the network operates under peak demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why tram signal priority and traffic light synchronization became central to the study. The goal was to coordinate traffic signals and tram movements so that trams could cross the square more smoothly without stopping in its center and obstructing pedestrian flow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We used PTV Vissim to model the area as a microscopic, multimodal system in which trams, taxis, general traffic, and pedestrians interacted under realistic operating conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For current Vissim users, priority should not be treated as a controller detail alone. In tram-heavy urban centers, tram performance depends on how crossings, access rules, and surrounding junctions work together, making <a href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/urban-mobility-microsimulation-in-a-unesco-heritage-city\/\" target=\"_blank\" rel=\"noreferrer noopener\">multimodal traffic simulation<\/a> essential.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bc5a7&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bc5a7\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"519\" height=\"416\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL4new_compressed.jpg\" alt=\"Traffic light synchronization context for tram routes in Piazza Cordusio\" class=\"wp-image-30969\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL4new_compressed.jpg 519w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL4new_compressed-449x360.jpg 449w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL4new_compressed-250x200.jpg 250w\" sizes=\"auto, (max-width: 519px) 100vw, 519px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Tram routes that shaped the signal coordination strategy<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In Cordusio, the modelling question was simple: could the scheme improve pedestrian continuity and simplify circulation without undermining tram operations?<\/p>\n\n\n\n<h2 id=\"h-building-the-ptv-vissim-model\" class=\"wp-block-heading\"><strong>Building the PTV Vissim model<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The model was built on detailed field data, including vehicle counts at eight intersections, pedestrian counts in Piazza Cordusio, and origin-destination matrices for cars, taxis, motorcycles, and light commercial vehicles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We analyzed both morning and afternoon peak periods. Dynamic assignment was used so that routing could respond to actual network conditions rather than remain fixed.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bcd3c&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bcd3c\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"506\" height=\"527\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL5_compressed.jpg\" alt=\"Intersections surveyed for the PTV Vissim model in Piazza Cordusio\" class=\"wp-image-30971\" style=\"object-fit:cover\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL5_compressed.jpg 506w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL5_compressed-346x360.jpg 346w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL5_compressed-192x200.jpg 192w\" sizes=\"auto, (max-width: 506px) 100vw, 506px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Survey locations used to build the microsimulation<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Model quality depends on whether the inputs reflect how the area really operates. In Cordusio, that meant capturing vehicle demand, pedestrian flows, and multimodal conflicts around the tram network. This was essential for testing traffic light synchronization under realistic conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Because PTV Vissim is stochastic, we did not rely on a single run. We simulated the model with 16 random seeds to produce more robust results and reduce the risk of drawing conclusions from isolated variation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Validation was equally important. The study reports an R\u00b2 of 0.98 and GEH below 5 for 98 percent of flows, giving confidence that the base model was accurate enough for <a href=\"https:\/\/blog.ptvgroup.com\/en\/trend-topics\/mobility-hubs-the-future-of-multimodal-transportation\/\" target=\"_blank\" rel=\"noreferrer noopener\">scenario testing<\/a>.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bd40b&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bd40b\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"452\" height=\"449\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL6_compressed.jpg\" alt=\"PTV Vissim model zoning used for traffic light synchronization testing\" class=\"wp-image-30973\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL6_compressed.jpg 452w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL6_compressed-362x360.jpg 362w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL6_compressed-201x200.jpg 201w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL6_compressed-150x150.jpg 150w\" sizes=\"auto, (max-width: 452px) 100vw, 452px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Model zoning used for scenario testing<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Milan Piazza Cordusio - Vissim AM Base Scenario\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/PmZMPKSHfbU?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h2 id=\"h-testing-traffic-light-synchronization-pedestrianization-and-access\" class=\"wp-block-heading\"><strong>Testing traffic light synchronization, pedestrianization, and access<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The project concept combined several linked changes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Via Dante was closed to general traffic,<\/li>\n\n\n\n<li>More space in Piazza Cordusio was reallocated to pedestrians,<\/li>\n\n\n\n<li>Through-movements were simplified,<\/li>\n\n\n\n<li>Taxi and motorcycle functions were reorganized,<\/li>\n\n\n\n<li>The tram alignment in Via Orefici was shifted to improve pedestrian space around a busy stop area.<\/li>\n<\/ul>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bdcd1&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bdcd1\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"515\" height=\"363\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL7new_compressed.jpg\" alt=\"Traffic light synchronization tested with revised signal cycles in Milan\" class=\"wp-image-30975\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL7new_compressed.jpg 515w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL7new_compressed-511x360.jpg 511w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL7new_compressed-284x200.jpg 284w\" sizes=\"auto, (max-width: 515px) 100vw, 515px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Revised signal cycles supported coordinated tram movements<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A key element of the proposal was traffic light synchronization, designed to better coordinate tram movements through the square and reduce unnecessary stops that could obstruct pedestrian flow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The main scenario was tested first with fixed-cycle signal control, even though more advanced actuated technology was considered as a next step.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Milan Piazza Cordusio - Vissim PM Project scenario\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/6SDkKiSjKXY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">That was a sound choice because it allowed the team to assess whether the layout and circulation strategy were operationally viable before making the results dependent on additional control technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A practical lesson is to isolate the effects of geometry, circulation, and signal strategy before introducing more advanced control logic. In Cordusio, the model tested the scheme as an integrated multimodal system in which pedestrian demand, tram operations, and constrained access all influenced the outcome.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2be4e9&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2be4e9\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"784\" height=\"624\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr-784x624.jpg\" alt=\"Redesigned tram alignment and pedestrian space in Via Orefici\" class=\"wp-image-30961\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr-784x624.jpg 784w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr-452x360.jpg 452w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr-768x612.jpg 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr-1536x1223.jpg 1536w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr-251x200.jpg 251w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/PiazzaCordusio-schema_lr.jpg 1920w\" sizes=\"auto, (max-width: 784px) 100vw, 784px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Via Orefici redesign balanced tram and pedestrian needs<\/figcaption><\/figure>\n\n\n\n<h2 id=\"h-what-the-model-revealed\" class=\"wp-block-heading\"><strong>What the model revealed<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The value of the exercise was that it did not simply confirm the design intent. It quantified the likely impact of the proposed street layout and signal strategy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the study summary, the project scenario improved average network speed, particularly during the PM peak, while reducing delays and queues at key locations such as Piazza Cordusio and Via Orefici.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Milan Piazza Cordusio  - Vissim PM Base 3D\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/ygz-FGNxv4I?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Signal operations were also simplified, moving from a 100-second cycle to an 83-second cycle in the tested scenario. This supported better traffic light synchronization and allocated more green time to <a href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/pedestrian-crossing-planning-benchmarking-signalised-junctions\/\" target=\"_blank\" rel=\"noreferrer noopener\">pedestrian movements and crossings<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The most important takeaway is the choice of KPIs. Network speed, node delay, queue length, tram performance, and pedestrian conditions provided the basis for comparing alternatives.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The key result was that the redesign improved circulation and pedestrian continuity without materially undermining tram operations. The model showed that <a href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/from-gridlock-to-flow-ptv-vissim-transforms-traffic-in-marrakesh\/\" target=\"_blank\" rel=\"noreferrer noopener\">public-space reallocation and operational reliability<\/a> could be improved together rather than treated as competing objectives.<\/p>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a8c3ab2bed89&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a8c3ab2bed89\" class=\"wp-block-image size-full wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"593\" height=\"381\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on--pointerdown=\"actions.preloadImage\" data-wp-on--pointerenter=\"actions.preloadImageWithDelay\" data-wp-on--pointerleave=\"actions.cancelPreload\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL10_compressed.jpg\" alt=\"Traffic light synchronization results for the Piazza Cordusio scenario\" class=\"wp-image-30959\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL10_compressed.jpg 593w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL10_compressed-560x360.jpg 560w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/MIL10_compressed-300x193.jpg 300w\" sizes=\"auto, (max-width: 593px) 100vw, 593px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\tdata-wp-bind--aria-label=\"state.thisImage.triggerButtonAriaLabel\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.thisImage.buttonRight\"\n\t\t\tdata-wp-style--top=\"state.thisImage.buttonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Results showed improved network performance across the study area <\/figcaption><\/figure>\n\n\n\n<h2 id=\"h-lessons-for-planners\" class=\"wp-block-heading\"><strong>Lessons for planners<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For me, the main lesson is that simulation is most valuable when it answers a clear operational question rather than simply documenting existing conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Cordusio, we used PTV Vissim to test whether pedestrianization, revised access rules, and traffic light synchronization could improve pedestrian continuity without degrading tram operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For Vissim users, the practical takeaways are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Start with the decision you need to make.<\/strong> Define the operational question before building the model.<\/li>\n\n\n\n<li><strong>Assess tram operations in context.<\/strong> Performance depends not only on signal settings, but also on crossings, access rules, short links, and queue spillback.<\/li>\n\n\n\n<li><strong>Use <\/strong><a href=\"https:\/\/blog.ptvgroup.com\/en\/technologyplus\/realistic-traffic-simulation-driving-behavior-is-key\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>realistic demand and routing<\/strong><\/a><strong>.<\/strong> Reliable inputs are essential for meaningful scenario comparisons.<\/li>\n\n\n\n<li><strong>Validate before comparing alternatives.<\/strong> A well-calibrated model provides confidence in the results.<\/li>\n\n\n\n<li><strong>Test changes in stages.<\/strong> Evaluate geometry, circulation, and signal strategies before introducing more advanced control technologies.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This approach helped us evaluate pedestrian and tram needs together, rather than treating them as competing objectives.<\/p>\n\n\n\n<h2 id=\"h-get-a-vissim-free-demo\" class=\"wp-block-heading\">Get a Vissim free demo<\/h2>\n\n\n\n<\/div>\n\n\n\n<div class=\"wp-block-column cta-box is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<div class=\"wp-block-cover\"><img loading=\"lazy\" decoding=\"async\" width=\"1254\" height=\"836\" class=\"wp-block-cover__image-background wp-image-25406\" alt=\"\" src=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184.jpg 1254w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-540x360.jpg 540w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-936x624.jpg 936w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-768x512.jpg 768w, https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2024\/10\/iStock-1312502184-300x200.jpg 300w\" sizes=\"auto, (max-width: 1254px) 100vw, 1254px\" \/><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-80 has-background-dim wp-block-cover__gradient-background has-background-gradient\" style=\"background:linear-gradient(135deg,rgb(66,104,249) 28%,rgb(41,224,133) 88%)\"><\/span><div class=\"wp-block-cover__inner-container is-layout-constrained wp-block-cover-is-layout-constrained\">\n<p class=\"has-text-align-center wp-block-paragraph\" style=\"font-size:24px;font-style:normal;font-weight:700\">Simulate people-focused streets<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">How to test PT operations, pedestrian space, <br>and street redesign strategies<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-f5f78b3b wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-white-background-color has-text-color has-background has-link-color has-text-align-center has-custom-font-size wp-element-button\" href=\"#h-get-a-vissim-free-demo\" style=\"border-radius:8px;color:#6482f6;font-size:14px;font-style:normal;font-weight:500\">Get free demo<\/a><\/div>\n<\/div>\n<\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"card-text\">In central Milan, we used traffic light synchronization in PTV Vissim to evaluate pedestrianization, signal timing, and multimodal operations, helping planners balance tram performance and pedestrian space [&#8230;]<\/p>\n<p class=\"m-0\"><a class=\"btn btn-outline-secondary btn-read-more\" href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/\">Read More<\/a><\/p>\n","protected":false},"author":5,"featured_media":30965,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8326,8322],"tags":[8380,8377,8371],"ppma_author":[8535],"class_list":["post-30984","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-modeling-planning","category-user-insights","tag-public-transport","tag-traffic-simulation","tag-urban-mobility"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How Milan Tested Traffic Light Synchronization with PTV Vissim | PTV Blog<\/title>\n<meta name=\"description\" content=\"Explore how Milan used PTV Vissim for traffic light synchronization, improving tram operations, pedestrian flow, and multimodal mobility.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How PTV Vissim tested tram traffic light synchronization\" \/>\n<meta property=\"og:description\" content=\"Explore how Milan used PTV Vissim for traffic light synchronization, improving tram operations, pedestrian flow, and multimodal mobility.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/\" \/>\n<meta property=\"og:site_name\" content=\"PTV Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/PTVGroupGlobal\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-19T06:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Header_alternative.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1025\" \/>\n\t<meta property=\"og:image:height\" content=\"577\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Guest author: The MIC-HUB team\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Guest Author\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/\"},\"author\":{\"name\":\"Guest Author\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/person\\\/ed495d952d445e59d4114dedcd7a86ba\"},\"headline\":\"How PTV Vissim tested tram traffic light synchronization\",\"datePublished\":\"2026-08-19T06:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/\"},\"wordCount\":1374,\"publisher\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Header_alternative.png\",\"keywords\":[\"Public Transport\",\"Traffic Simulation\",\"Urban Mobility\"],\"articleSection\":[\"Modeling &amp; Planning\",\"User Insights\"],\"inLanguage\":\"en-US\",\"accessibilityFeature\":[\"tableOfContents\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/\",\"name\":\"How Milan Tested Traffic Light Synchronization with PTV Vissim | PTV Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Header_alternative.png\",\"datePublished\":\"2026-08-19T06:00:00+00:00\",\"description\":\"Explore how Milan used PTV Vissim for traffic light synchronization, improving tram operations, pedestrian flow, and multimodal mobility.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#primaryimage\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Header_alternative.png\",\"contentUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Header_alternative.png\",\"width\":1025,\"height\":577},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/user-insights\\\/traffic-light-synchronization-milan-ptv-vissim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How PTV Vissim tested tram traffic light synchronization\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/\",\"name\":\"PTV Blog\",\"description\":\"We passionately write about technology which helps to plan and optimise the movement of people and goods.\",\"publisher\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#organization\",\"name\":\"PTV Group\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/PTV_Group_Logo_black.jpg\",\"contentUrl\":\"https:\\\/\\\/blog.ptvgroup.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/PTV_Group_Logo_black.jpg\",\"width\":1598,\"height\":362,\"caption\":\"PTV Group\"},\"image\":{\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/PTVGroupGlobal\\\/\",\"https:\\\/\\\/www.instagram.com\\\/ptv_group\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ptv\\\/\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/ThePTVGroup\",\"https:\\\/\\\/www.tiktok.com\\\/@ptv_group\\\/\"],\"description\":\"Our goal is to drive the future of mobility toward a cleaner, smarter, and safer world. With a legacy spanning over 40 years as a leading global software company for traffic planning, simulation, and real-time management, we have garnered extensive experience in the field of mobility.\",\"email\":\"info@ptvgroup.com\",\"telephone\":\"+49 721 9651-0\",\"legalName\":\"PTV Planung Transport Verkehr GmbH\",\"foundingDate\":\"1979-01-01\",\"vatID\":\"Umsatzsteuer-Identifikationsnummer gem\u00e4\u00df \u00a7 27a Umsatzsteuergesetz (UStG): DE 812 666 053\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"201\",\"maxValue\":\"500\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/#\\\/schema\\\/person\\\/ed495d952d445e59d4114dedcd7a86ba\",\"name\":\"Guest Author\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g7b083b76ac19858e26f915f16946093d\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g\",\"caption\":\"Guest Author\"},\"url\":\"https:\\\/\\\/blog.ptvgroup.com\\\/en\\\/author\\\/_ptadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How Milan Tested Traffic Light Synchronization with PTV Vissim | PTV Blog","description":"Explore how Milan used PTV Vissim for traffic light synchronization, improving tram operations, pedestrian flow, and multimodal mobility.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/","og_locale":"en_US","og_type":"article","og_title":"How PTV Vissim tested tram traffic light synchronization","og_description":"Explore how Milan used PTV Vissim for traffic light synchronization, improving tram operations, pedestrian flow, and multimodal mobility.","og_url":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/","og_site_name":"PTV Blog","article_publisher":"https:\/\/www.facebook.com\/PTVGroupGlobal\/","article_published_time":"2026-08-19T06:00:00+00:00","og_image":[{"width":1025,"height":577,"url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Header_alternative.png","type":"image\/png"}],"author":"Guest author: The MIC-HUB team","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Guest Author","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#article","isPartOf":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/"},"author":{"name":"Guest Author","@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/person\/ed495d952d445e59d4114dedcd7a86ba"},"headline":"How PTV Vissim tested tram traffic light synchronization","datePublished":"2026-08-19T06:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/"},"wordCount":1374,"publisher":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#organization"},"image":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#primaryimage"},"thumbnailUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Header_alternative.png","keywords":["Public Transport","Traffic Simulation","Urban Mobility"],"articleSection":["Modeling &amp; Planning","User Insights"],"inLanguage":"en-US","accessibilityFeature":["tableOfContents"]},{"@type":"WebPage","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/","url":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/","name":"How Milan Tested Traffic Light Synchronization with PTV Vissim | PTV Blog","isPartOf":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#primaryimage"},"image":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#primaryimage"},"thumbnailUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Header_alternative.png","datePublished":"2026-08-19T06:00:00+00:00","description":"Explore how Milan used PTV Vissim for traffic light synchronization, improving tram operations, pedestrian flow, and multimodal mobility.","breadcrumb":{"@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#primaryimage","url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Header_alternative.png","contentUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Header_alternative.png","width":1025,"height":577},{"@type":"BreadcrumbList","@id":"https:\/\/blog.ptvgroup.com\/en\/user-insights\/traffic-light-synchronization-milan-ptv-vissim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/blog.ptvgroup.com\/en\/"},{"@type":"ListItem","position":2,"name":"How PTV Vissim tested tram traffic light synchronization"}]},{"@type":"WebSite","@id":"https:\/\/blog.ptvgroup.com\/en\/#website","url":"https:\/\/blog.ptvgroup.com\/en\/","name":"PTV Blog","description":"We passionately write about technology which helps to plan and optimise the movement of people and goods.","publisher":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blog.ptvgroup.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/blog.ptvgroup.com\/en\/#organization","name":"PTV Group","url":"https:\/\/blog.ptvgroup.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2021\/11\/PTV_Group_Logo_black.jpg","contentUrl":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2021\/11\/PTV_Group_Logo_black.jpg","width":1598,"height":362,"caption":"PTV Group"},"image":{"@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/PTVGroupGlobal\/","https:\/\/www.instagram.com\/ptv_group\/","https:\/\/www.linkedin.com\/company\/ptv\/","https:\/\/www.youtube.com\/user\/ThePTVGroup","https:\/\/www.tiktok.com\/@ptv_group\/"],"description":"Our goal is to drive the future of mobility toward a cleaner, smarter, and safer world. With a legacy spanning over 40 years as a leading global software company for traffic planning, simulation, and real-time management, we have garnered extensive experience in the field of mobility.","email":"info@ptvgroup.com","telephone":"+49 721 9651-0","legalName":"PTV Planung Transport Verkehr GmbH","foundingDate":"1979-01-01","vatID":"Umsatzsteuer-Identifikationsnummer gem\u00e4\u00df \u00a7 27a Umsatzsteuergesetz (UStG): DE 812 666 053","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"201","maxValue":"500"}},{"@type":"Person","@id":"https:\/\/blog.ptvgroup.com\/en\/#\/schema\/person\/ed495d952d445e59d4114dedcd7a86ba","name":"Guest Author","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g7b083b76ac19858e26f915f16946093d","url":"https:\/\/secure.gravatar.com\/avatar\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/777300521aa8a03e2c61b2f9fe07539be3010687eb16fd620967d6058d707805?s=96&d=blank&r=g","caption":"Guest Author"},"url":"https:\/\/blog.ptvgroup.com\/en\/author\/_ptadmin\/"}]}},"authors":[{"term_id":8535,"user_id":0,"is_guest":1,"slug":"guest-author-the-mic-hub-team","display_name":"Guest author: The MIC-HUB team","avatar_url":{"url":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Untitled-design-64.png","url2x":"https:\/\/blog.ptvgroup.com\/wp-content\/uploads\/2026\/07\/Untitled-design-64.png"},"author_category":"1","first_name":"","last_name":"","user_url":"","job_title":"MIC-HUB is an international transport and mobility consultancy firm based in Milan. The company combines data-driven analysis, transport modelling, infrastructure design and stakeholder engagement in order to develop accessible, sustainable and evidence-based transport solutions.","description":"MIC-HUB is an international transport and mobility consultancy firm based in Milan. The company combines data-driven analysis, transport modelling, infrastructure design and stakeholder engagement in order to develop accessible, sustainable and evidence-based transport solutions."}],"_links":{"self":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts\/30984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/comments?post=30984"}],"version-history":[{"count":9,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts\/30984\/revisions"}],"predecessor-version":[{"id":31002,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/posts\/30984\/revisions\/31002"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/media\/30965"}],"wp:attachment":[{"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/media?parent=30984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/categories?post=30984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/tags?post=30984"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blog.ptvgroup.com\/en\/wp-json\/wp\/v2\/ppma_author?post=30984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}